NextHire Try for free

Headsup Corporation

Posted 27 Jul 2026

SR Manager Costing :Automotive

Apply with NextHire Auto Apply fills in the application for you.
Employment
Full time
Team
costing engineer
Posted
27 Jul 2026

About the role

Position : Senior Manager-Costing

Location : Gurgaon

JD-Costing Cell Manager

  • Experience  11-14 years 
  • Should be from Auto Industry & assembly manufacturing 
  • Well versed with Excel & Basic Formula 
  • SAP can be added advantage 
  • Should be Techno-Commercial 
  • Basic of costing fundamentals is must 

Designation:  Costing Cell team member

1. Cost Estimation and Budgeting

  • Develop accurate cost estimates for projects based on project plans, drawings, and specifications.
  • Prepare detailed budgets, identifying all potential cost variables such as labor, materials, and overheads.
  • Regularly update cost estimates based on changes in project scope, design, or external factors.

2. Cost Control and Monitoring

  • Track and monitor actual project costs against budgeted costs to identify variances.
  • Implement corrective actions to control costs, ensuring projects stay within budget.
  • Provide timely alerts to management about potential cost overruns or savings opportunities.

3. Cost Analysis and Reporting

  • Perform detailed cost analysis to determine the reasons for cost variances.
  • Prepare and submit periodic financial reports on project costs, highlighting key performance indicators (KPIs).
  • Provide detailed cost breakdowns and forecasts for ongoing and future projects.

4. Tendering and Bidding

  • Assist in the preparation of tender documents and bid submissions by calculating cost estimates for various projects.
  • Support the selection of vendors and suppliers by providing cost-effective recommendations based on estimates.
  • Ensure all tender submissions comply with financial and project specifications.

5. Compliance and Documentation

  • Ensure all cost-related activities comply with industry regulations, standards, and company policies.
  • Maintain accurate and organized documentation of cost estimates, budgets, and financial reports for audit and review.

6. Cost Optimization

  • Continuously look for ways to reduce costs while maintaining quality and project timelines.
  • Suggest alternative materials or methods that could lead to cost savings without compromising on project standards.

 These Role & Responsibility ensure that the Costing Engineer effectively manages the financial aspect of engineering projects, maintaining profitability and cost efficiency.

Preferably worked with Automobile industries and aware of commodities of ( Steel Rubber Plastic )

85% of jobs are never posted

The AI Outreach Agent writes to recruiters and hiring managers at the companies you pick, from your own Gmail.

Try AI Outreach